Cost Model

Materials Quantity Unit Cost/Item Cost
Mass of structure (kg)   60/kg  
Pop rivets   0.1  
Bolts M4   0.6  
M5   0.9  
M6   1.2  
Total cost for materials (a)  

 

Labour Quantity Unit Cost/Item Cost
All drilled holes (rivet holes and bolt holes) but see note 1 below   2  
Bars/rods (see note 2 below) Total used   4  
Extra bends   8  
Steel metal items Total used   4  
Bends < 300 mm in length   6  
Bends ³ 300 mm in length   64  
Lengths of wire Total used   8  
Total cost for labour (b)  

 

Total cost for materials (a)  
Total cost for labour (b)  
Total cost for bridge (a+b)  

 

Note 1: a hole drilled through several sheets counts as one hole, and the holes for the 13 mm loading attachment are free.

Note 2: any length of steel angle counts as a bar; rods include lengths of rod, tube and studding.